Login

Software decisions

Fleet Utilisation Reports: Agree the Working Hours Before Comparing Vehicles

Two utilisation percentages can describe different working hours. Check engine time, available days, idling and missing data before comparing fleet reports.

Conceptual illustration of unbranded fleet vans beside paper shift calendars and analogue clocks

Ask what the percentage divides by

A fleet utilisation report is only comparable when the activity being counted and the time available for that activity are defined consistently. Before comparing two vehicles, ask what counts as use, which days are included and how many hours form the denominator. A higher percentage alone does not establish more deliveries, better service or a vehicle that can safely be removed from the fleet.

For an India fleet management software evaluation, bring the actual working pattern: a weekday delivery group, a night operation or vehicles held in reserve. Record the reporting time zone and date boundaries as well. Use the existing Fleet Utilization glossary definition for the general term; this article focuses on checking the calculation behind a report, rather than providing another definition or a universal target.

Vendor reports can answer different questions

Hapn’s help article defines its utilisation percentage using total engine hours divided by the reporting days multiplied by eight hours. That is a vendor-specific daily benchmark. Connected Cars describes active utilisation as ignition-on time within a 24-hour day, considering days with at least one trip. Its documentation includes driving and idling in that activity measure. Those are different comparisons, even before differences in the source data are considered.

Ask the provider to show the definition used by the report in your proposed deployment. Do not transfer a percentage threshold, engine-hour signal or reporting feature from either manual to SafarTrak. Geotab’s asset-utilisation announcement also illustrates the value of separating days, hours, distance and idle versus drive time; it is product-specific documentation, not proof that another platform supplies the same report.

A worked example: the same hours, different percentages

Fictional example: assume a vehicle has 30 verified engine-on hours across five active days in a seven-day review period. For this illustration only, assume all 30 hours occurred on those five days, and all records are complete. Against five planned eight-hour days, 30 ÷ (5 × 8) × 100 is 75%. Against seven eight-hour calendar days, the same 30 hours become about 53.6%. Against five full 24-hour active days, they become 25%.

These are three explicitly chosen bases for the same fictional activity, not three performance results or an exact reconstruction of any vendor’s fleet-wide aggregation. The vehicle did no extra work when the percentage changed. Write the denominator next to the number and compare like with like. If a report averages per-vehicle percentages, also ask how it weights different vehicles and handles days without trips; do not assume that averaging percentages equals dividing the fleet’s total hours by its total available hours.

Keep planned availability separate from observed activity

A day with no trip can mean a planned rest day, maintenance, reserve duty, no assigned work or missing evidence. These explanations have different implications. Agree the available days with the responsible operations team instead of letting the presence of a trip silently define the entire working calendar. Keep sensitive vehicle identifiers, duty schedules and customer locations in controlled operational records.

Compare vehicles with similar jobs and availability. A depot standby vehicle and a scheduled delivery van may have legitimate differences in activity. Separate an observation about recorded use from a decision about required fleet capacity. This worksheet does not establish a staffing plan, a safe working duration, a savings figure or grounds to remove a vehicle. Those decisions need the relevant operational evidence and responsible review.

Separate engine-on, driving and productive work

Engine-on time, time in motion and completed operational work answer different questions. State which signal the numerator uses and whether waiting with the engine on is included. An ignition indication does not by itself demonstrate a loaded journey, a completed delivery or productive work. Confirm which readings the actual device and vehicle supply, and how the proposed report turns them into time.

Use the existing idling resources for investigating engine-on waiting; do not change their definitions to make a utilisation figure look better. For an electric or mixed fleet, ask which activity measure is available for each vehicle type before combining them. This article does not promise engine-hour support for every tracker, direct vehicle-bus access, an automatic utilisation score or a right-sizing engine in SafarTrak.

Leave missing evidence unknown

Before comparing a reporting period, check expected coverage, gaps and late-arriving records using the existing data-quality acceptance Guide. A blank activity interval is not automatically zero use. Ask whether incomplete records exclude a vehicle, change the denominator, create an estimate or leave the result unavailable. Record that treatment beside the report rather than silently filling gaps with zero.

Keep the original export or evidence reference, generation time and calculation definition so a later review can explain a changed result. If delayed records arrive, distinguish a revised observation from a change in actual work. Do not label an uncertain percentage as a verified improvement. The worksheet deliberately leaves its evidence and result fields blank; it contains no private fleet data.

Bring a calculation brief to the demo

Complete the blank utilisation review worksheet with the decision, vehicle group, period and time zone, activity signal, availability basis, idle treatment, coverage status and evidence owner. Ask the provider to demonstrate one representative complete period and one incomplete period. Recalculate a small sample from approved demonstration records and record any unexplained difference before accepting the report.

Use SafarTrak’s platform page and movement demonstration to discuss the journey, stop and activity records your team needs. Confirm available signals, report definitions and any manual review required for your exact deployment. The platform remains the commercial software page; this article is a narrower buying aid. It offers no universal utilisation benchmark, guaranteed ranking, return on investment or assertion that SafarTrak generates the worked percentages.

Sources and further reading

The linked vendor manuals illustrate different report definitions, not a universal formula or SafarTrak capability. The numerical example is fictional; the worksheet is blank.

BRING IT TO YOUR FLEET

Start with your vehicles.
Ask the right questions.

Share your vehicle mix, existing devices and required signals with the SafarTrak team.

Discuss fleet software and activity recordsDiscuss your deployment

KEEP READING

More from the blog

View all articles